Septic Permits

You must have an issued onsite wastewater system permit or a completed a Septic Permit Application-Conventional System or a Septic Permit Application – Alternate System, along with Site Investigation results to submit with your application or proof of sewer system connection.  Please see the Environmental Services page for more information.

Floor Plan: An 8-1/2” x 11” floor plan is required for all submittals.  All rooms and areas need to be labeled, including doorway and window locations.

 